Governs the 34 residential condominium units and commercial spaces across the 4 mixed-use residential condominium buildings.
- Building Roofs & Drainage: Common roof membranes, metal flashings, and gutter downspouts.
- Building Envelopes: Exterior masonry, siding, architectural trim, and breezeway structures.
- 100 Laydon Way Common Elements: Central elevator, interior corridors, entry foyers, and security locks.
- Life Safety & Specialized HVAC: Central fire suppression riser, backflow prevention, and loft HVAC systems.
Oversees community-wide infrastructure, master recreational amenities, and grounds shared by both single-family homes and condominium parcels.
- Landscaping & Lawn Care: Common turf mowing, seasonal bed mulching, tree trimming, and irrigation.
- Community Amenities: Neighborhood swimming pool, clubhouse building, playground, and pavilions.
- Waste & Curbside Services: Community residential trash collection contracts and dumpster corrals.
- Stormwater & Common Grounds: Retention ponds, drainage swales, and community streetlights.
Responsible for everything within the interior boundaries of the deeded condominium unit from the interior drywall inward.
- Interior Finishes & Fixtures: Drywall paint, flooring, cabinetry, appliances, and plumbing fixtures.
- Individual Utilities: Water heaters, electrical sub-panels, interior wiring, and standard unit HVAC filters.
- Windows & Glass: Window panes, screens, window hardware, and unit entry door locks.
- Private Dryer Vents: Routine maintenance from appliance collar to external discharge hood.
| Component / Area | Responsible Entity | Maintenance & Service Scope | Typical Timing | Action / Contact Channel |
|---|---|---|---|---|
|
Building Roofs & Flashing
All 4 residential condominium buildings
|
Condo Assoc. (COA) | Full roof structural membrane, periodic leak inspections, shingle/metal repairs, perimeter flashing, and roof drainage headers. | As needed (storm damage) | Submit COA Work Order → |
|
Building Envelopes & Siding
Exterior facades, brickwork & cladding
|
Condo Assoc. (COA) | Exterior building painting, fiber-cement siding repairs, brick repointing, building caulking, and exterior trim maintenance. | Bi-Annual (Spring/Fall) | Submit COA Work Order → |
|
Elevator Maintenance
Exclusively at 100 Laydon Way
|
Condo Assoc. (COA) | Monthly preventive service, quarterly safety checks, emergency telephone circuit, annual state inspections, and machinery repairs. | As needed | Report to Management → |
|
Common Interior Corridors
100 Laydon Way hallways & lobby
|
Condo Assoc. (COA) | Corridor lighting, carpeting cleaning, common drywall painting, electronic access doors, Brivo entry controllers, and common vestibules. | As needed | Submit COA Work Order → |
|
Fire Suppression Systems
Sprinklers, standpipes & alarms
|
Condo Assoc. (COA) | Annual certified riser flow testing, backflow certification, common smoke detection, visual head inspection, and central alarm monitoring. | As needed | View Vendor Schedule → |
|
Loft HVAC Systems
Specialized loft units per declarations
|
Condo Assoc. (COA) | Association oversight of specialized loft rooftop compressors/air-handling components as designated under condominium master documents. | Bi-Annual (Spring/Fall) | Submit COA Work Order → |
|
Gutters & Downspouts
Condominium roofline collection
|
Condo Assoc. (COA) | Semi-annual clearing of debris, seam re-caulking, downspout flushing, and secure strapping to exterior facades. | As needed | View Vendor Schedule → |
|
Common Area Pest Prevention
100 Laydon Way corridors & grounds border
|
Condo Assoc. (COA) | Routine exterior perimeter barrier treatments and interior common utility/hallway pest exclusion. | Monthly (grounds) | Submit COA Work Order → |
|
Landscaping & Turf Care
Common neighborhood lawns & beds
|
Master HOA | Turf mowing, edging, seasonal fertilization, flower bed mulching, tree pruning, leaf removal, and common irrigation system repairs. | Report via Master HOA Portal | |
|
Residential Trash Collection
Curbside & community dumpsters
|
Master HOA | Community waste management contract, scheduled weekly trash and recycling pick-up cycles, and dumpster corral enclosure maintenance. | Master HOA Waste Services | |
|
Community Swimming Pool
Master amenity pool & sun deck
|
Master HOA | Water chemistry, pump and filtration systems, pool deck furniture, access gate credentials, and seasonal opening/winterization. | Master HOA Pool Committee | |
|
Clubhouse Facility
Master community clubhouse & event space
|
Master HOA | Building structural maintenance, interior amenity cleaning, HVAC, reservations, and community fitness center equipment. | Master HOA Facility Management | |
|
Common Grounds & Play Areas
Pocket parks, sidewalks & trails
|
Master HOA | Community sidewalk leveling, master path snow clearing, pet waste stations, playground mulch, and community park benches. | Master HOA Grounds Team | |
|
Stormwater Retention Ponds
Master environmental infrastructure
|
Master HOA | Sediment clearing, aquatic weed abatement, embankment erosion stabilization, and storm drainage culverts. | Master HOA Engineering | |
|
Interior Unit Finishes
From perimeter wall studs inward
|
Unit Owner | Drywall repair, painting, flooring (hardwood/carpet/tile), kitchen & bathroom cabinetry, and interior doors. | Licensed Private Contractor | |
|
Unit Plumbing Fixtures
Pipes within unit serving only that unit
|
Unit Owner | Toilets, sinks, bathtubs, shutoff valves, internal supply lines, water heaters, and garbage disposals. | Licensed Plumber of Choice | |
|
Standard HVAC (Non-Loft)
Unit furnace, heat pump & thermostat
|
Unit Owner | Regular air filter replacements, seasonal tune-ups, thermostat calibration, refrigerant charges, and compressor maintenance. | Licensed HVAC Service | |
|
Windows, Glazing & Patio Doors
Unit glass surfaces & mechanisms
|
Unit Owner | Thermal pane seal replacements, window glass cleaning, weatherstripping, screen repairs, and sliding patio door hardware. | Window Specialist (Match Specs) | |
|
Dryer Vent Cleaning
Exhaust duct from laundry appliance
|
Unit Owner | Annual lint clearing from dryer collar through ductwork to exterior vent flapper to prevent household fire hazard. | As needed | See Community Group Rates → |
|
Snow & Ice Removal
|
Condo Assoc. (COA) | All 4 residential condominium buildings, common driveways, parking areas, and walkways. Per Board Policy: triggered when accumulation exceeds 2 inches. Goodmanagement coordinates contractor dispatch. | Per snow event (Dec-Mar) | Submit COA Work Order → |
|
Fire Extinguisher Inspection
|
Condo Assoc. (COA) | All common area extinguishers in hallways, mechanical rooms, and electrical closets. Monthly visual inspection; annual professional certification. | Annual (October) | Submit COA Work Order → |
|
Rodent & Pest Barrier
|
Condo Assoc. (COA) | Common corridors, trash rooms, mechanical spaces, and exterior perimeter. Quarterly bait station service and entry point sealing. | Quarterly (Jan/Apr/Jul/Oct) | Submit COA Work Order → |
|
Loft HVAC Split Unit Servicing
|
Condo Assoc. (COA) | 100 Laydon Way loft building split-system heat pumps and air handlers. Filter replacement, refrigerant check, coil cleaning, and condensate line service. | Semi-Annual (Apr/Oct) | Submit COA Work Order → |
|
Termite Inspection & Treatment
|
Condo Assoc. (COA) | All 4 residential buildings and loft structure. Annual wood-destroying insect inspection and preventive treatment barrier. | Annual (March) | Submit COA Work Order → |
Common Clarifications & Situations
Quick guidance on everyday maintenance questions encountered by Nelson's Grant residents.
Unscheduled Capital Projects — Future Priority Register
The following capital improvement projects have been identified by the Board and Goodmanagement as needing future consideration for funding and scheduling. These are not yet approved or budgeted but are tracked here for transparency and community awareness.
Gutter Replacement — Building 2
Leaking gutters on south elevation of Building 2 causing ice dams and water intrusion into units 204/206. Estimated 180 linear feet of seamless aluminum gutter with leaf guards.
Fire Suppression System Replacement
Legacy hardwired fire alarm system (Cox) has reached end of life. Migrate to mobile/wireless fire alarm monitoring. Condominium-wide upgrade including new panels, detectors, and central monitoring.
Roof Membrane Resurfacing — Building 4
Roof membrane on Building 4 is 18 years old with documented ponding water and UV degradation. Full resurfacing with TPO membrane recommended before next winter season.
Elevator Modernization — Building 1
Elevator #1 in Building 1 is 19 years old with intermittent controller faults. Modernization includes new controller, cab interior, and ADA-compliant fixtures.
Stormwater Drainage Repair
Stormwater retention pond behind Building 3 has erosion damage to berm and clogged outlet culvert. Requires regrading and new HDPE culvert installation.
Brick Facade Repointing — Building 3
North elevation brick veneer on Building 3 has mortar joint deterioration and spalling. Tuck pointing and sealant replacement recommended.
Note: Projects listed above are not yet approved or funded. The Board reviews and prioritizes capital projects during the annual budget cycle (typically Q4). Residents may submit project suggestions through the COA Work Order system or attend Board meetings to advocate for specific improvements.

